ColoCrossing will be performing a power maintenance in our San Jose facility in cabinet 09.01. Due to the nature of the work being completed, this will result in power loss to the devices connected to pdua.09.01 for up to 45 minutes during the maintenance window specified in EST.
UPDATE: This is now resolved. If you are still experiencing any issues please open a support ticket and we'd be happy to assist.